Specification
Floor level: 11F/B2
Structure: Reinforced concrete
Typical Office Space: 264㎡ ~4,860㎡ (flexibility)
Slab to Slab: 4 meters
Ceiling height: 2.7 meters
Floor Loading: 400 kg/㎡
Building Type: Office, R&D office
Ptolmaic Fractal
Craig Schaffer specializes in the art topics of a process of life. This work was completed in 1997, as like the philosophy of Taiji, every life comes to death and born again, the life cycle of nature is following its law and never end.
Front Desk
TPKA building is operated by Tokyo Property Management. The front desk assists visitor access and taxi service.
Bank
E.SUN Bank is located on the ground level of TPKA.
Restaurant
Restaurants, Sufood and GiGou are located on the ground level of TPKA.
Frenzy 2
Peter Zimmermann was trying to convey the intricate of global network such as database or figures through his art.
He attempts to break the identification of photos and paintings. However, it seems Peter has magic to alive those works via the strong color and the irregular gloss surface of epoxy.
Ascending Community
It illustrates the meaning of how members of community needs contribute back to the environment first by reaching a higher level. It is a representation of how members of society are linked to each other to achieve the goal of progress, also to reflect the aim of providing a best cluster of Tpark.